Physicians group challenges license extension for Point Beach nuclear plant March 27, 2021
Wisconsin’s only operating nuclear power plant is Point Beach near Two Rivers, about 45 miles southeast of Green Bay. Physicians for Social Responsibility is challenging NextEra Energy’s efforts to extend the plant licenses through 2050.
More In the News
Thousands Rally at Baltimore’s War Memorial Plaza for ‘No Kings’ Day
Chesapeake PSR's Drs. Terry Fitzgerald and Gwen DuBois in Washington, DC in October 2025 The Greyhound The concerns on display stretched well beyond immigration. Terry...
Tax Day Realities: Nuclear Weapons and Our Dangerous, Misguided Priorities
Op-ed by PSR Los Angeles Board Member Dr. Robert Dodge | Common Dreams These expenditures rob our communities of precious resources that could be redirected...
The Nuclear Industry Won’t Lower Your Electricity Bill
Michael Rincon, Research & Policy Manager for PSR–Los Angeles; and Haakon Williams, Committee to Bridge the Gap | Los Angeles Sentinel The cost of living...
